• Achieve digitization, artistic enhancement, and landscaping of the plants through advanced management concepts and highly skilled operation teams.
• Adopt improved and advanced flue gas treatment processes to ensure the flue gas emission standard higher than the EU 2000 standard.
• Optimize the comprehensive utilization of slag from traditional incinerators, with 100% of incineration slag utilized and 98% metals recovered.
• Build a scientifically effective leachate treatment system to support “zero discharge” of leachate.
National AAA-level waste-to-energy project
One of key projects under the central environmental protection inspection
Key livelihood project of Yueyang
Covering an area of approximately 31.93 hectares, with a total investment of nearly 800 million yuan.
Daily disposal capacity of 1,500 tons of domestic waste for power generation, 150 tons/day kitchen waste pretreatment line, as well as corresponding emergency and fly ash landfills.
Flue gas emission standard higher than the EU 2010 standard, meeting the pollution emission requirements of Beijing-Tianjin-Hebei atmospheric pollution transmission channel cities (“2+26” cities).
First waste-to-energy project in Yili Kazakh Autonomous Prefecture
Designed to treat 1500 tons of waste per day, and constructed in two phases with the first phase treating 1,000 tons daily
Expected to annually treat 333,300 tons of waste and generate on-grid electricity of 92.5850 million kWh
Covering an area of approximately 8.4 hectares, with a total investment of 600 million yuan
Adopt bio-drying technology of domestic waste and grate furnace incineration treatment to treat 1,500 tons of waste per day.
One of major projects for ecological development in Guangxi